contestada

a road crew can repave 1/48 of a road each hour. they must repave a road that is 3/8 miles long. how long will it take the crew to repave the road?

Respuesta :

3/8 / 1/48 = 3/8 x 48/1 = 144/8 = 18 hours

Answer:

It will take 18 hours.

Step-by-step explanation:

Given,

The crew can repave  [tex]\frac{1}{48}[/tex] miles,

The length of road they must repave = [tex]\frac{3}{8}[/tex] miles,

Hence,

[tex]\text{The time taken by them to repave the road}=\frac{\text{The road they must repave}}{\text{The length they repave per hour}}[/tex]

[tex]=\frac{3/8}{1/48}[/tex]

[tex]=\frac{144}{8}[/tex]

[tex]=18\text{ hours}[/tex]