Answer:
the work done by friction on the car is 524,582 J.
Explanation:
Given;
mass of the roller coaster, m = 800 kg
distance moved by the coaster, d = 225 ft = 68.58 m
final velocity of the coaster, v = 80 mi/h = 35.76 m/s
The time taken for the coaster to drop down the hill is calculated as;
[tex]t = \sqrt{\frac{2h}{g} } \\\\t = \sqrt{\frac{2\ \times \ 68.58}{9.8} } \\\\t = 3.74 \ s[/tex]
The work done by friction on the car is calculated as;
[tex]W =F\ \times \ d = \frac{mv}{t} \times \ d\\\\W = \frac{800 \ \times \ 35.76 }{3.74} \times \ 68.58\\\\W = 524,582 \ J[/tex]
Therefore, the work done by friction on the car is 524,582 J.