An oil-well contractor drills a shaft 7 meters deeper into the ground every 2 hours. Which graph has a slope that best represents this rate?

Answer:
the fourth one
Step-by-step explanation:
every 2 hours will be a positive line segment relating to the 7 meters give you the point of 14 every 4 hours