Three activity frame designs for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting dataset. The following results were obtained:
∑² =10800
∑² =4510
Set up the ANOVA table for this problem (to 2 decimals, but p-value to 4 decimals, if necessary).